hero-wte-plant
Modular Waste-to-Energy

County-level waste-to-energy, engineered for scale.

Modular 50–300 t/day plants with a three-stage grate furnace and HRDS flue gas treatment for sparsely populated regions in China and worldwide.

grate-furnace
Core Technology

The three-stage mechanical grate furnace.

A modular reciprocating grate design that breaks the barrier to scaling down large grate furnaces, backed by 50+ patents.

hrds-flue-gas
Ultra-Low Emissions

HRDS: dioxin suppressed at the source.

A high-temperature flue gas system operating at 850–1100°C that removes SO2 and HCl and achieves ultra-low emissions.

22+ years of R&D

50+ patents across grate design, combustion and emission control.

Below national standards

Dioxin prevented at source; ultra-low emissions.

EcoTec Solutions (Qingfeng)

Integrated modular waste-to-energy.

R&D, equipment manufacturing, construction and operations for county-level waste treatment — 22 years of R&D and 50+ patents, serving China and emerging markets.

Partners include the Dalian Institute of Chemical Physics (CAS) and Sinomach.

22+ years
R&D track record
50+ patents
Grate, combustion, emissions
50–300 t/day
Modular capacity range
plant-background
Core business
Core business
County-level waste-to-energy
Technology
Three-stage grate + HRDS
Markets
China, Africa, Southeast Asia, Oceania

Small-scale waste-to-energy facility

County-level waste treatment

Why EcoTec

Technology that solves modular incineration.

Traditional modular incineration faces low efficiency, high pollution and costly operation. Qingfeng built a system around stability, efficiency and emissions.

01 / Combustion1

Three-stage grate furnace

A modular reciprocating grate that maintains stable combustion even with high-moisture, high-ash rural waste and mixed composition.

50–300 t/day
Core equipment
02 / Emissions2

HRDS flue gas treatment

Dioxin suppressed at source at 850–1100°C; SO2 and HCl removed with 30%+ lower consumables and fly ash.

Ultra-low emissions
Flue gas treatment
03 / Recovery3

Zero discharge and resource recovery

Flue gas heat reuses leachate and wastewater; ash is screened and magnetically separated into recycled aggregates.

Zero wastewater discharge
Resource recovery

Shop the edit

Best sellers and new arrivals

Start with the pieces customers reach for first: tactile carry goods, calm home tools, and small upgrades that make daily routines feel more intentional.

Fresh inventory is highlighted first, with category filters available on the full shop page.

View all products
hrds-flue-gas

Core technology

Built around a complete technical system.

Over 22 years of R&D covering waste collection, transport, incineration and resource recovery.

Three-stage grate furnace

Miniaturized reciprocating grate for 50–300 t/day plants.

HRDS flue gas

High-temperature purification additive, 850–1100°C.

Resource recovery

Scrap iron and recycled aggregates from incineration ash.

Read about the technology

Proven in the field

Reference projects that are operating today.

Recognized as a national demonstration project

Hezhang County, Guizhou — a 60 t/day eco-environmental service station (built 2019, national acceptance 2020).

Hezhang Pilot Project
National demonstration project (MOHURD panel)

Changning County, Yunnan — a 120 t/day waste incineration industrial park (passed technical acceptance 2023).

Changning Demonstration
CNY 85M investment

Stable combustion and ultra-low emission technology for modular MSW, judged internationally advanced.

ACEF Technical Appraisal
January 2025

Insights and case studies

Reference projects and technology deep-dives

Read the latest case studies, technology deep-dives and market insights from the EcoTec Solutions team.

View all insights
Latest insights

Buyer questions

Questions buyers ask about modular WtE.

Answers on capacity, waste types, emissions and delivery.

Still need help? Send us a note and our engineering team will reply.

Project inquiries

Talk to our engineering team.

Share your project capacity, waste type and location for a tailored proposal.

We reply through our contact form or WhatsApp.

Contact

Tell us about your waste-to-energy project

Send your capacity, waste type and location, and our engineering team will follow up with next steps.

Email
jessielaw@139.com
WhatsApp
+86 131 1224 6878
Office
Huadu District, Guangzhou, Guangdong Province, China
WeChat
+86 137 2989 5441

Inquiry intake

Send the details

Share a few details about your request so we can send a useful reply.

0/120
0/1200